{"id":3175,"date":"2016-08-09T10:00:59","date_gmt":"2016-08-09T10:00:59","guid":{"rendered":"http:\/\/bakrie-brothers.id\/dev\/?p=3175"},"modified":"2020-11-14T16:26:09","modified_gmt":"2020-11-14T16:26:09","slug":"bnbr-works-on-us-107-million-wellhead-platform-madura-strait-block-project","status":"publish","type":"post","link":"https:\/\/bakrie-brothers.com\/id\/news-and-media\/bnbr-works-on-us-107-million-wellhead-platform-madura-strait-block-project\/","title":{"rendered":"BNBR Garap Proyek Wellhead Platform Blok Madura Strait Senilai US$107 Juta"},"content":{"rendered":"<p>Sumber: Humas BNBR | 09 Agu 2016<\/p>\n\n\n\n<p>BNBR atau Perseroan melalui unit usahanya, PT Bakrie Construction (BCons), Selasa (9\/8) resmi memulai pengerjaan fisik pemotongan pertama konstruksi proyek pembangunan dua \u2018kaki jaket\u2019 wellhead platform senilai US$107 juta. Fabrikasinya dilakukan di unit produksi milik PT Bakrie Construction di kawasan Sumuranja, Banten. Ini merupakan bagian dari fasilitas pendukung pengeboran atau eksplorasi gas bumi milik Husky-CNOOC Madura Ltd (HCML) di Blok Madura Straits.<\/p>\n\n\n\n<p>Direktur Utama BNBR Bobby Gafur Umar mengatakan, proyek pembangunan dua unit wellhead platform ini dikerjakan konsorsium PT Bakrie Construction dengan PT Timas Suplindo, sebuah perusahaan kontraktor struktur bangunan dan komponen baja. \u201cBNBR fokus dalam pengerjaan EPC (Engineering, Procurement, Construction) untuk dua konstruksi bangunan wellhead platform MDA dan MBH; selain menyiapkan 20 jaringan pipa gas yang menyambungkan dari wellhead platform MDA dan MBH yang berjarak 28,1 kilometer dan 14 jaringan pipa gas yang nantinya disambungkan ke floating production unit (FPU) milik HCML. Total nilai proyeknya US$107 juta,\u201d kata Bobby kepada wartawan, usai acara pemotongan pertama (first cutting) pipa baja yang menandakan dimulainya proyek tersebut, di Sumuranja, Banten, Selasa.<\/p>\n\n\n\n<p>Sementara, PT Timas Suplindo bertugas melakukan pengerjaan pengangkutan dan pengiriman serta instalasi wellhead platform ke fasilitas FPU Gas di anjungan lepas pantai selat Madura yang berlokasi 200 kilometer sebelah timur Surabaya.<\/p>\n\n\n\n<p>Pekerjaan fisik wellhead platform sampai dengan instalasi di offshore tersebut, menurut Bobby, ditargetkan selesai pada awal Januari 2018. \u201cHari ini, kita melakukan first cutting atau pemotongan pertama \u2018kaki jaket\u2019 wellhead platform,\u201d kata Bobby. Acara tersebut dihadiri perwakilan dari Ditjen Migas Kementerian ESDM, perwakilan SKK Migas, Jajaran Direksi HCML, Jajaran Direksi BNBR serta Jajaran Direksi PT Timas Suplindo dan PT Bakrie Construction. Bobby berharap, proyek ini bisa selesai sesuai waktu yang ditetapkan dalam kontrak. \u201cIni bukti, di tengah lesunya sektor migas, bisnis manufaktur BNBR masih bergerak,\u201d lanjut Bobby menambahkan.<\/p>\n\n\n\n<p>Sebagai informasi, Husky-CNOOC Madura Ltd (HCML), berencana membangun fasilitas pengolahan (FPU) gas berkapasitas 175 mmscfd di selat Madura. Fasilitas pengolahan tersebut berlokasi di anjungan lepas pantai sekitar 200 kilometer timur kota Surabaya atau 75 kilometer sebelah Tenggara pulau Madura. Di masa mendatang, gas yang sudah diolah tersebut akan dijual untuk memenuhi kebutuhan pembeli gas di Pulau Jawa.<\/p>\n\n\n\n<p>Untuk mendukung pengoperasian fasilitas tersebut, HCML membutuhkan dua wellhead platform, 20 jaringan pipa gas yang menghubungkan wellhead platform MDA ke MBH (berjarak 28,1 kilometer), fasilitas FPU berupa converter tanker\/vessel, serta 14 jaringan pipa gas yang menghubungkan FPU ke MBH yang berlokasi di East Java Gas Pipeline (EJGP).<\/p>\n\n\n\n<p>PT Bakrie Construction sendiri merupakan unit usaha PT Bakrie & Brothers Tbk yang telah memiliki pengalaman luas dalam fabrikasi dan proyek EPC sektor migas. Tujuh puluh persen proyek BCons berasal dari proyek EPC migas, dan produk fabrikasi BCons juga sudah di ekspor ke sejumlah negara, antara lain Sri Lanka, Singapura dan Australia. Belum lama ini, Bcons menyelesaikan proyek mooring tower atau menara tambat (konstruksi besi-baja yang terdiri dari pile, jacket, topside dan yoke) untuk konstruksi EPC-3 Proyek Banyu Urip pesanan Mobile Cepu Ltd.<\/p>\n\n\n\n<p>Untuk informasi lebih lanjut, hubungi:<br>Bayu Nimpuno<br><strong>Head of Corporate Communications<\/strong><br>Email : bayu.nimpuno@bakrie.co.id<\/p>","protected":false},"excerpt":{"rendered":"<p>Source: Humas BNBR | 09 Aug 2016 BNBR or the Company through its business unit, PT Bakrie Construction (BCons), on Tuesday (9\/8) officially started the physical construction of the first cut project construction of two \u2018jacket legs\u2019 wellhead platform worth US$ 107 million. The fabrication is carried out at the production unit owned by PT Bakrie Construction in the Sumuranja area, Banten. This is part of the Husky-CNOOC Madura Ltd (HCML) supporting gas drilling or exploration facility in the Madura Strait Block. BNBR President Director Bobby Gafur Umar said that the construction of the two wellhead platform projects was carried out by a consortium of PT Bakrie Construction with PT Timas Suplindo, a building structure and steel component contracting company. \u201cBNBR focuses on the EPC (Engineering, Procurement, Construction) work for two MDA and MBH wellhead building construction; in addition to preparing 20 gas pipelines connecting from MDA and MBH wellhead platforms within 28.1 kilometers and 14 gas pipelines which will be connected to HCML\u2019s floating production unit (FPU). The total project value is US $ 107 million, \u201cBobby told reporters, after the first cutting of the steel pipe that marked the start of the project, in Sumuranja, Banten, on Tuesday. Meanwhile, PT Timas Suplindo is tasked with carrying out the transportation and shipping work as well as the installation of the wellhead platform to the FPU Gas facility on the Madura Strait offshore platform, located 200 kilometers east of Surabaya. The physical work of the wellhead platform to the offshore installation, according to Bobby, is targeted to be completed in early January 2018. \u201cToday, we are doing the first cutting of the\u201d jacket legs \u201cof the wellhead platform,\u201d Bobby said. The event was attended by representatives from the Directorate General of Oil and Gas Ministry of Energy and Mineral Resources, representatives of SKK Migas, the Board of Directors of HCML, the Board of Directors of BNBR and the Board of Directors of PT Timas Suplindo and PT Bakrie Construction. Bobby hopes that this project can be completed in accordance with the time specified in the contract. \u201cThis is proof that, amid the sluggish oil and gas sector, BNBR manufacturing business is still moving,\u201d continued Bobby added. For information, Husky-CNOOC Madura Ltd (HCML), plans to build a 175 mmscfd gas processing facility (FPU) in the Madura Strait. The processing facility is located on an offshore platform about 200 kilometers east of Surabaya or 75 kilometers southeast of Madura Island. In the future, the processed gas will be sold to meet the needs of gas buyers in Java. To support the operation of the facility, HCML requires two wellhead platforms, 20 gas pipelines connecting the MDA platform wellhead to the MBH (28.1 kilometers away), FPU facilities in the form of a tanker \/ vessel converter, and 14 gas pipelines connecting the FPU to the MBH located at East Java Gas Pipeline (EJGP). PT Bakrie Construction itself is a business unit of PT Bakrie &amp; Brothers Tbk which has extensive experience in fabrication and EPC projects in the oil and gas sector. Seventy percent of BCons projects come from oil and gas EPC projects, and BCons fabrication products have also been exported to a number of countries, including Sri Lanka, Singapore and Australia. Not long ago, Bcons completed a mooring tower or mooring tower project (iron-steel construction consisting of piles, jackets, topside and yokes) for the construction of EPC-3 Banyu Urip Project Mobile Cepu Ltd order. For further information, contact:Bayu NimpunoHead of Corporate CommunicationsEmail : bayu.nimpuno@bakrie.co.id<\/p>","protected":false},"author":1,"featured_media":3182,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[37],"tags":[],"class_list":["post-3175","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news-and-media"],"_links":{"self":[{"href":"https:\/\/bakrie-brothers.com\/id\/wp-json\/wp\/v2\/posts\/3175","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bakrie-brothers.com\/id\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/bakrie-brothers.com\/id\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/bakrie-brothers.com\/id\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/bakrie-brothers.com\/id\/wp-json\/wp\/v2\/comments?post=3175"}],"version-history":[{"count":0,"href":"https:\/\/bakrie-brothers.com\/id\/wp-json\/wp\/v2\/posts\/3175\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/bakrie-brothers.com\/id\/wp-json\/wp\/v2\/media\/3182"}],"wp:attachment":[{"href":"https:\/\/bakrie-brothers.com\/id\/wp-json\/wp\/v2\/media?parent=3175"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/bakrie-brothers.com\/id\/wp-json\/wp\/v2\/categories?post=3175"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/bakrie-brothers.com\/id\/wp-json\/wp\/v2\/tags?post=3175"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}